Jump to content


Photo

New Zealand Diploma in Construction (Level 6) with strands in Construction Management and Quantity Surveying

Quantity Surveyor baby Construction OP2420

  • Please log in to reply
1 reply to this topic

#1 CRUSADER1612

CRUSADER1612

    Newbie

  • Members
  • Pip
  • 2 posts

Posted 22 January 2018 - 04:02 AM

I'm a few courses into this diploma, and we recently had a baby.... He can be a little challenging at times.

I work full time as a junior QS as well (lucky break).

 

these past 2 courses (107/108) have been more challenging than most, as my son requires more time for bed, frequent wake ups etc. plus my longer working hours.

 

I'm considering going down to 1 course per trimester (I really want to keep going at this speed, to get it completed) as I've been a little overwhelmed with the amount of work required, plus work, plus family time.

If anyone has any tips for me to keep going on 2 courses at a time I'd be much appreciated.

(next 2 course would be CON109, and CQS101).

 

Cheers all.

Rob.



#2 Ryan Toyne

Ryan Toyne

    Newbie

  • Members
  • Pip
  • 1 posts

Posted 02 April 2018 - 10:27 PM

Hi,

 

My name is Ryan and I am studying towards the old National Diploma in Quantity Surveying.  

 

Am currently doing the US 9637 Programme Practice an am struggling.  Anybody out there who has mastered the network diagram / early or late start / float concepts?

 

Thanks in advance.







Also tagged with one or more of these keywords: Quantity Surveyor, baby, Construction, OP2420

0 user(s) are reading this topic

0 members, 0 guests, 0 anonymous users